LBA Block schedule v1.1

From: <Jim.Lovell_at_email.protected>
Date: Mon, 19 Sep 2005 10:23:54 +1000

Hi everyone,

A revised version of the LBA schedule (v1.1) is now on the LBA
Schedules page. Hopefully this is the final version but please send
any comments/corrections to me and Chris.

Notes for PIs:
--------------

** Please note that schedule files are due by Thursday Monday October
17 at the
latest **. Please direct any questions about the observations (including
schedule file preparation) to vlbiobs_at_atnf.<!--nospam-->csiro.au.

Please use NRAO SCHED to prepare your schedule files. SCHED is installed
on the Unix machines at ATNF or can be obtained from
     ftp://ftp.aoc.nrao.edu/pub/sched/
Please prepare your schedule using a standard configuration unless you
have good reason not to. Standard configs are described at
     http://www.atnf.csiro.au/vlbi/observing/lba_s2_configs.html
The corresponding SCHED configuration files are installed at ATNF or can
be obtained from the above URL.

When your files are ready, please upload them to
ftp://ftp.atnf.csiro.au/pub/people/vlbi/incoming including
your .key, .skd and .sum files plus any configuration files if you used
a non-standard config. Once the file is uploaded please notify the
observers at vlbiobs_at_atnf.<!--nospam-->csiro.au.

Cheers,
Jim
--
Dr Jim Lovell,                                      Jim.Lovell_at_csiro.<!--nospam-->au
CSIRO Australia Telescope National Facility       Ph:    (02) 6125 6715
c/o RSAA, Mt Stromlo Observatory,                 Fax:   (02) 6125 0260
Cotter Road, Weston ACT 2611                      Mobile:   0412 127364
Australia                    http://www.atnf.csiro.au/people/Jim.Lovell
At Tidbinbilla Ph (02) 6201 7842 (RA Lab), x7800 (switch), x7940(shift)
On 15/09/2005, at 4:35 PM, Chris Phillips wrote:
> On Thu, 15 Sep 2005, Jim Lovell wrote:
>
>
>> So do you mean 4 continuous hours?
>>
>
> The time after v187a would be perfect...
>
>
>
>>
>> -Jim
>>
>> --
>> Dr Jim Lovell,                                       
>> Jim.Lovell_at_csiro.<!--nospam-->au
>> CSIRO Australia Telescope National Facility       Ph:    (02) 6125  
>> 6715
>> c/o RSAA, Mt Stromlo Observatory,                 Fax:   (02) 6125  
>> 0260
>> Cotter Road, Weston ACT 2611                      Mobile:   0412  
>> 127364
>> Australia                    http://www.atnf.csiro.au/people/ 
>> Jim.Lovell
>> At Tidbinbilla Ph (02) 6201 7842 (RA Lab), x7800 (switch), x7940 
>> (shift)
>>
>>
>>
>> On 15/09/2005, at 2:19 PM, Chris Phillips wrote:
>>
>>
>>>
>>>
>>>
>>>>
>>>> OK, no worries, I'll add it to the schedule. Chris, how much  
>>>> time do
>>>> you need for your PCFS tests? I'll put in a placeholder for them  
>>>> and
>>>> you can always cancel later if you end up not needing them.
>>>>
>>>>
>>>
>>> Few hours. Though we probable ant about 1hour after the change the
>>> systems
>>> back over.
>>>
>>> Cheers
>>> Chris
>>>
>>>
>>
>>
>