Action items from the LBA operations meetings at perth - DRAFT

From: <Tasso.Tzioumis_at_email.protected>
Date: Fri, 27 Mar 2009 16:22:37 +1100

Hi everyone,

Attached is the draft of the action items from the LBA ops meetings
recently held at Perth.

Please let me know of any additions/corrections by 1 April 2009. I
will then revise and post on our web.

Thanks and cheers
Tasso

----------------------------------------------------------------------
Tasso Tzioumis, Australia Telescope National Facility, CSIRO
Location: Cnr Pembroke & Vimiera Rds, Marsfield, NSW, 2122, AUSTRALIA
Post: PO Box 76, Epping, NSW 1710, AUSTRALIA
Phone: +61 2 9372 4350 Fax: +61 2 9372 4450 or 4310
Email: Tasso.Tzioumis_at_csiro.<!--nospam-->au
URL: http://www.atnf.csiro.au/~atzioumi/
----------------------------------------------------------------------

LBA Operations meeting. Curtin 12 March 2009.
--------------------------------------------------------------

A: ACTIONS carried over or modified from Hobart 2008 meeting.
-----------------------------------------------------------

ACTION 1 (old 6): Investigate/implement/document developments on polarisation calibration and
Cir-Linear polarisation conversion (Tasso/Richard)

ACTION 2 (old 7): LBA test-time for L-band feed at Ceduna (Tasso/Brett)

ACTION 3 (old 9): Investigate broadband feed developments e.g. Kildal feed (Jim)

ACTION 4 (old 17): Get Parkes Tsys calibration for each session (Tasso/JER)

B. New ACTIONS

ACTION 5: Investigation of self-cal/cacal modes with ATCA for phasing-up tied array.
ACTION 5a: Results of tests in Feb 09 (Richard/Tasso).
ACTION 5b: Check on recent TANAMI data (Hayley/Roopesh).
ACTION 5c: Incorporate CAL flags into SCHED and parse into atnf sched (Cormac)

ACTION 6: Separate disk pool from Swinburne. Need to get back ATNF disks and return Swinburne disks. (Claire)

ACTION 7: No buying of new disks. Develop network transfers to Curtin, either direct or via ARCS (All)

ACTION 8: Buy more Mk5 disks for use with Parkes/Tid/Hobart and establish LBA Mk5 disk pool. (Curtin)

ACTION 9: Investigate scheduling of short or long LBA sessions. Take into account Ceduna support and Tid TANAMI access (Phil/Tasso/Shinji)

ACTION 10: Improve checking during LBA observing sessions
ACTION 10a: Produce periodic checklists (~ every 3hrs) for each antenna. (All)
ACTION 10b: Implement SCHED flags for possible automatic fringe checking (Cormac/Chris)
ACTION 10c: Improve LBA network monitoring (Chris/Curtin)
ACTION 10d: Better training of observers (All)

ACTION 11: Improve Wiki documentation.
ACTION 11a: Document DAS modes at Parkes (Tasso/JER)
ACTION 11b: Document Hobart DAS modes and frequency setups (Jim)
ACTION 11c: Backup all DAS profiles into LBA ftp area (Chris/Tasso)
ACTION 11d: Enable LBA wiki external file attachments (Chris)

ACTION 12: Update of SCHED with new LBA parameters and setups. Test for July 09 LBA session. (Cormac)

ACTION 13: AT TAC recommended more time for VLBI due to high proposal pressure! (Phil/Tasso)

ACTION 14: Clarify LBA timing for public availability of data. (Phil/Tasso)

ACTION 15: Establish procedures for timely operation with external antennas and media.
ACTION 15a: Inform PIs of data transfer requirements in PI letters at schedule time (Phil/Tasso)
ACTION 15b: Sort out current data transfer issues with TIGO and O'Higgins. (Tasso/Hayley/Chris)
ACTION 15c: Investigate use of South American antennas (TIGO, O'Higgins, Fortaleza, Peru,...) with LBA, to compensate for loss of Hart. New MOUs? (Tasso)

ACTION 16: DIFX new version to produce IDI FITS. RPFITS compatibility needs to be retained. (ATNF/Curtin)

ACTION 17: ** Curtin to organise DiFX developers meeting (Cormac)

ACTION 18: Need to make LBA archive available online like ATOA.
ACTION 18a: ATNF to investigate cross-referencing LBA data from ATOA (Tasso)
ACTION 18b: Possible new software from new ICRAR positions (Steven)

ACTION 19: Next meeting in 2010. Possible synergies with IVS meeting in Hobart (2nd week of Feb 2010) or Summer school in NZ (Feb 2010). Liaise on timing and place (Tasso)