second draft July LBA schedule
- Contemporary messages sorted: [ by date ] [ by thread ] [ by subject ] [ by author ] [ by messages with attachments ]
From: <Philip.Edwards_at_email.protected>
Date: Fri, 2 Jul 2010 16:28:36 +1000
Hi,
A second draft of the July LBA schedule is available from
(the same URL -- be sure to refresh)
http://www.narrabri.atnf.csiro.au/people/Philip.Edwards/jul10.png .
This version splits v186 into two halves so that the receiver change can be done at a reasonable hour at Ceduna.
(Brett R, can you please check this is okay now?)
The V186 mode is now correctly shown: it is 256 Mbps at Cd & Ho and 512 Mbps at At, Mp, Pa, which will affect
disk calculations for the latter three.
vx016a is a ToO observation of Cir X-1: the exact mode (eVLBI? disk-recording? both?) is still tbd.
Cheers,
Phil
Received on 2010-07-02 16:33:25
Date: Fri, 2 Jul 2010 16:28:36 +1000
Hi,
A second draft of the July LBA schedule is available from
(the same URL -- be sure to refresh)
http://www.narrabri.atnf.csiro.au/people/Philip.Edwards/jul10.png .
This version splits v186 into two halves so that the receiver change can be done at a reasonable hour at Ceduna.
(Brett R, can you please check this is okay now?)
The V186 mode is now correctly shown: it is 256 Mbps at Cd & Ho and 512 Mbps at At, Mp, Pa, which will affect
disk calculations for the latter three.
vx016a is a ToO observation of Cir X-1: the exact mode (eVLBI? disk-recording? both?) is still tbd.
Cheers,
Phil
Received on 2010-07-02 16:33:25