This loads a font easier to read for people with dyslexia.
This renders the document in high contrast mode.
This renders the document as white on black
This can help those with trouble processing rapid screen movements.

Re: schedules for August session

From: Cormac Reynolds <c.reynolds_at_email.protected>
Date: Wed, 14 Aug 2013 10:38:18 +0800

hi Jamie,

I changed the mode for Ceduna to 64 MHz. Other stations are unaffected.

cheers,
Cormac

On 13 August 2013 18:17, Jamie McCallum <Jamie.McCallum_at_email.protected> wrote:
> Hi Cormac,
> With the v252al schedule, is it possible to amend the setup to use
> the 64 MHz mode at Ceduna? With the cDisko bug fixed, it would make things
> much easier if Bev doesn't have to swap out the BG3 cable.
> Cheers,
> Jamie
>
>
> On 13/08/13 14:03, Cormac Reynolds wrote:
>>
>> hi,
>>
>> I fixed the problem with v186c (which also affected v486b and v253c).
>> It was an error in the SCHED setup file for the Gbps stations. I have
>> redistributed the schedules, but the changes only affect the ATNF
>> stations.
>>
>> cheers,
>> Cormac.
>>
>> On 13 August 2013 11:47, Cormac Reynolds <c.reynolds_at_email.protected
>>>
>>> hi Chris,
>>>
>>> I take it you mean v186c? Is it the channel order you are worried
>>> about (I think the frequencies are o.k., but agree the wiki assigns
>>> them to the wrong IFPOLs)? That's easily fixed.
>>>
>>> cheers,
>>> Cormac
>>>
>>> On 13 August 2013 11:39, <Chris.Phillips_at_email.protected
>>>>
>>>> Hi Cormac
>>>>
>>>> There is something wrong with the v196c schedule - the wiki pages is not
>>>> consistent with what is wanted. Mopra and ATCA will record the wrong
>>>> frequencies I think with the current setup.
>>>>
>>>> Chers
>>>> Chris
>>>>
>>>> On 13/08/2013, at 1:32 PM, Cormac Reynolds wrote:
>>>>
>>>>> hi all,
>>>>>
>>>>> v186c has been distributed now.
>>>>>
>>>>> cheers,
>>>>> Cormac
>>>>>
>>>>> On 12 August 2013 19:19, Cormac Reynolds <c.reynolds_at_email.protected
>>>>> wrote:
>>>>>>
>>>>>> hi all,
>>>>>>
>>>>>> the schedules for this session are on the wiki and have been
>>>>>> distributed, except v186c which is being revised and should be
>>>>>> available tomorrow.
>>>>>>
>>>>>> Please note that the user schedules now incorporate the fringe check
>>>>>> schedules, so start at the time designated for the fringe check. v255t
>>>>>> also has an accompanying separate fringe check schedule (vc213) to
>>>>>> test the second mode (I recommend fringe testing on vc213 before
>>>>>> switching to the main schedule to test the first mode). In other cases
>>>>>> the fringe check page on the wiki is unfilled.
>>>>>>
>>>>>> Also, most of the PIs have used the new 'intents' parameter in SCHED
>>>>>> to designate suitable fringe finder and ATCA phasing sources. I hope
>>>>>> this will prove useful for the observers.
>>>>>>
>>>>>> regards,
>>>>>> Cormac.
>>>>>>
>>>>>> --
>>>>>> ----------------------------------------------------
>>>>>> Cormac Reynolds
>>>>>> Phone: +61 8 9266 3785
>>>>>> Fax: +61 8 9266 9110
>>>>>> email: c.reynolds_at_email.protected
>>>>>> ----------------------------------------------------
>>>>>
>>>>>
>>>>>
>>>>>
>>>>> --
>>>>> ----------------------------------------------------
>>>>> Cormac Reynolds
>>>>> Phone: +61 8 9266 3785
>>>>> Fax: +61 8 9266 9110
>>>>> email: c.reynolds_at_email.protected
>>>>> ----------------------------------------------------
>>>>
>>>>
>>>>
>>>
>>>
>>>
>>> --
>>> ----------------------------------------------------
>>> Cormac Reynolds
>>> Phone: +61 8 9266 3785
>>> Fax: +61 8 9266 9110
>>> email: c.reynolds_at_email.protected
>>> ----------------------------------------------------
>>
>>
>>
>>
>



-- 
----------------------------------------------------
Cormac Reynolds
Phone: +61 8 9266 3785
Fax: +61 8 9266 9110
email: c.reynolds_at_email.protected----------------------------------------------------
Received on 2013-08-14 12:39:45