|
About Science Observing Internal |
Main /
HardwareHardware at the Parkes TelescopeTesting the hardware project. Future hardware includes the full digital filterbank system and APSR. Prototype pulsar digital filterbank Testing PDFB2After the installation of the second prototype DFB, tests were carried out at Parkes aimed towards identifying problems within the hardware. To help identify issues, simultaneous observations were taken using PDFB1, PDFB1.5 (PDFB2), and CPSR2. Report on Data Analysis, testing during 30/4 - 8/5, 2007 |