User Tools

Site Tools


lbaops:actionslba-ops-2014

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:actionslba-ops-2014 [2015/02/05 18:12]
tasso
lbaops:actionslba-ops-2014 [2015/12/18 16:38] (current)
Line 71: Line 71:
     *  Xcube in real-time fringe checker (Chris)     *  Xcube in real-time fringe checker (Chris)
  
 +  -  ACTION: Continue wiki contest for best logs (LBA)
 +    *  Winners for 2013: 1st - Tid; 2nd - UTas; 3rd - ATNF
  
   -  ACTION: eVLBI pointing for Ww (Chris, Cormac, Jamie M, NZ) - CONT   -  ACTION: eVLBI pointing for Ww (Chris, Cormac, Jamie M, NZ) - CONT
Line 117: Line 119:
  
     *  Linear to circular conversion in DiFX after FFT. Check on ATCA. (Chris)     *  Linear to circular conversion in DiFX after FFT. Check on ATCA. (Chris)
 +
  
   -  ACTION: Networks and e-VLBI Demos - ** CONT **   -  ACTION: Networks and e-VLBI Demos - ** CONT **
     *  Invite IVEC to networking meetings (ATNF)     *  Invite IVEC to networking meetings (ATNF)
 +    *  UTas firewall issues (UTas)
     *  Overseas telescopes in eVLBI? (Tasso)     *  Overseas telescopes in eVLBI? (Tasso)
       *  Indian connectivity?​ Letter to GMRT re VLBI timing issues (Tasso)       *  Indian connectivity?​ Letter to GMRT re VLBI timing issues (Tasso)
       *  Regular Asia eVLBI tests?       *  Regular Asia eVLBI tests?
       *  Malaysia connectivity?​ (ATNF)       *  Malaysia connectivity?​ (ATNF)
 +
 +
     *  Demos     *  Demos
-      ​*  NEXPReS BoD by June 2013 (Tasso, AARNet) +      *  ASKAP-KAT7 in eVLBI? ​ ​- ​ 
-      *  MWA demo in July? ASKAP demo? +      *  10 GBps correlation (Chris, Cormac) ​- CONT 
-      ​*  ASKAP-KAT7 in eVLBI? +        *  ​Investigate Pawsey and other SPCs in Oz. 
-      *  10 GBps correlation (Chris, Cormac) +        *  Telecon within ~6 weeks (Ben, Cormac, Chris) 
-    *  ​Network costs from AARNet.+ 
 +      *  Brazil eVLBI demo? (Tasso) 
 +        *  Brazil-SouthAfrica-Oz-Ww-Argentina?​
  
   -  ACTION: e-VLBI developments - ** CONT **   -  ACTION: e-VLBI developments - ** CONT **
     *  Promote eVLBI better (All)     *  Promote eVLBI better (All)
     *  eVLBI scheduling (cf EVN of ~10sessions/​year) (ATNF)     *  eVLBI scheduling (cf EVN of ~10sessions/​year) (ATNF)
-    *  Advertise better e-VLBI capabilities with DiFX 2.0 (Tasso) 
     *  Utilise more e-VLBI test-time (ATNF)     *  Utilise more e-VLBI test-time (ATNF)
-    *  Finalise VTP standard (Chris) 
     *  Investigate Tid e-VLBI connectivity (Tasso)     *  Investigate Tid e-VLBI connectivity (Tasso)
  
Line 147: Line 153:
     *  Monitor recorder/​Disk developments (all)     *  Monitor recorder/​Disk developments (all)
       *  Replacement of LBA recorders/​Disks?​       *  Replacement of LBA recorders/​Disks?​
-    *  Investigate Tsys logging in DBBC +
     *  Cal scheme for linear-circular polarisation conversion (Chris, Cormac)     *  Cal scheme for linear-circular polarisation conversion (Chris, Cormac)
  
-  -  ACTION: VLBI Science meeting in Darwin/​Katherine. Mid-2013? (Tasso, Jim)+  -  ACTION: VLBI Science meeting in Darwin/​Katherine. Mid-2014? (Tasso, Jim
 + 
 +  -  ACTION: Next Ops meeting venue at Tidbinbilla (Shinji))
  
-  -  ACTION: ​Next Ops meeting venue at Perth/​Pawsey (Tasso, Cormac)+  -  ACTION: ​Update news page on CSIRO website.
  
  
lbaops/actionslba-ops-2014.txt · Last modified: 2015/12/18 16:38 (external edit)