lbaops:actionslba-ops-2016 [2017/02/15 10:04]
ste616 going through the action items at LBA meeting, Feb 2017
lbaops:actionslba-ops-2016 [2017/02/15 10:20] (current)
ste616 reviewing action items at LBA meeting, Feb 2017
Line 35: Line 35:
     * vex2     * vex2
   *  Tid DASPro entries (Chris)   *  Tid DASPro entries (Chris)
 +    * not done yet
   *  DASPRo 64 MHz flipping (Chris)   *  DASPRo 64 MHz flipping (Chris)
 +    * not done yet
   *  AK07 position (Leonid?) //[Emailed 19-Feb]//   *  AK07 position (Leonid?) //[Emailed 19-Feb]//
 +    * cannot happen
   *  RtFC   *  RtFC
     *  Sub second DIFX  (Chris) [Done 29/2/16]     *  Sub second DIFX  (Chris) [Done 29/2/16]
Line 44: Line 47:
   *  Automatic e-checklist (JamieS)   *  Automatic e-checklist (JamieS)
   *  EVN tutorial comparison for LBA (Cormac->​Chris)   *  EVN tutorial comparison for LBA (Cormac->​Chris)
 +    * EVN analysis guide actually, but not done yet
   *  Tsys data (Chris)   *  Tsys data (Chris)
 +    * continued
   *  Continue 1921-293/​1934-638 ATCA calibration   *  Continue 1921-293/​1934-638 ATCA calibration
 +    * not being done, still desirable, possibly use ATCA calibrator database as a first reference
  