User Tools

Site Tools


lbaops:actionslba-ops-2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:actionslba-ops-2018 [2018/02/20 13:44]
chrisphillips
lbaops:actionslba-ops-2018 [2019/06/17 22:05] (current)
chrisphillips
Line 1: Line 1:
   * Check data rates on Call for Proposals (CP)   * Check data rates on Call for Proposals (CP)
   * Feed back to PIs wrt Calc11 change   * Feed back to PIs wrt Calc11 change
 +    * Check Calc10 -> calc11 astrometry difference (SE)
 +  * Update from UTAS to SCHED catalogues for planned release (SE) [done 21/2]
 +  * Test longer fringe test dump times and explore more frequent dumps.
 +    * Run fringe test for Ceduna at Ceduna?
 +    * Use 0723-008 at K-band.
 +    * Check Dump times for Mark5 fringe check(SE)
 +    * Clean up Mark5 directories
 +  * Purchase 2 or 3 new VSI recorders (CP) [done]
 +    * Investigate increasing disk capacity on new recorders (CP) [done on new purchases]
 +  * Allow direct tcp connection to UTAS for lba_monitor (JS, SE)
 +  * Warkworth to provide pointing direction to lba_monitor in J2000 (TN, JS, Jamie McCallum)
 +  * Decide on possible skype replacement [done, Mattwermost adopted]
 +  * Vex2 requirement for UTAS broadband [done - will be needed]
 +
 +
 +Busy Day
 +
 +  * Ceduna Pointing
 +  * Bruce Segfault [done 21/2]
 +  * Reverse Ceduna Fringe Test
 +  * Fringe Test pipeline
 +  * Spec Recorder Machines
 +  * Update lba-monitor pages
 +    * Remove recorders, auto experiment update
 +  ​
 +
lbaops/actionslba-ops-2018.1519094688.txt.gz · Last modified: 2018/02/20 13:44 by chrisphillips