User Tools

Site Tools


lbaops:datamanagement:dec09disktransfer

Calendar of Black-listed times

Note maximum transfer speeds:
Hobart MUST be below 100Mbps.
Parkes needs plenty of bandwidth spare for pulsar data. See Calendar below.
ATCA+Mp+Parkes must be <512Mbps.
Tidbinbilla transfers not required in December '09.

See also individual telescope schedules:
Hobart December '09 schedule
Parkes Oct09-Mar10 schedule
ATCA 7th Dec - 20th Dec
Mopra 7th-20th December

(:includeurl Pmcal.Pmcal height=600px :)

Data Transfer to Pbstore

Can check these against the full transfers summary page.

Experiment Disk Location Status
Hobart (hovsi)
vt10i ATNF V016B Done
v310a CURT V003B hovsi Done
v318a ATNF V016B Done
v255h CURT V001B Done
v316b CURT V001B Done
v277c UTAS V001A hovsi Done
v190m UTAS V001A hovsi Done
v252o UTAS V002A Done
Parkes
v310a DAS1 ATNF V017A pkvsi1 Done
v310a DAS2 ATNF V014B pkvsi2 Done
v318a ATNF V013B pkvsi2 Done
v255h ATNF V010B pkvsi1 Done
v316b ATNF V010B pkvsi1 Done
v277c CURT V002B pkvsi1 Done
v190m CURT V002B, ATNF V013B pkvsi1 Done
v252o ATNF V014A pkvsi1 Done
v271c ATNF V001B pkvsi2 Not Req'd
ATCA
v310a DAS1 ATNF V009B offline Done
v310a DAS2 ATNF V004A offline Done
v318a ATNF V006B offline Done
v255h cave-store-ext:/data2/v255h Done
v316b ATNF V006B offline Done
v277c ATNF V015A offline Done
v190m ATNF V015A, ATNF V005A offline Done
v252o ATNF V002A offline Done
Mopra
v310a DAS1 ATNF V002B mpvsi1 Done
v310a DAS2 cave-store-ext:/data1/v310a_Mp_DAS2 Done
v318a CURT V002A mpvsi1 Done
v255h UTAS V001B mpvsi2 Done
v316b UTAS V001B mpvsi2 Done
v277c cave-store-ext:/data1/v277c Done
v190m cave-store-ext:/data1/v190m Done
v252o cave-store-ext:/data3/v252o Done
Tid
N/A N/A