User Tools

Site Tools


lbaops:lbaapr2012:v466atilog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbaapr2012:v466atilog [2012/04/30 04:34]
shoriuchi
lbaops:lbaapr2012:v466atilog [2015/12/18 16:38] (current)
Line 1: Line 1:
-S-band Recever pass: RCP->​DPLX->​LNA1->​D/​C-1,​ LCP->​LONO->​LNA2->​D/​C-2 ​+S-band Recever pass: RCP->​DPLX->​LNA1(Maser)->D/C-1, LCP->​LONO->​LNA2(Hemt)->​D/​C-2 ​
  
 2nd LO: 432MHz,​432MHz ​ 2nd LO: 432MHz,​432MHz ​
Line 7: Line 7:
 Recorded to ATNF V0011,B1-7 mounted as /​data/​xraid1 ​ Recorded to ATNF V0011,B1-7 mounted as /​data/​xraid1 ​
  
-Observer: Shinji Horiuchi and Ops-A team+Observer: Shinji Horiuchi and Paul Bladford (Ops-A team)
  
 DOY120 DOY120
Line 25: Line 25:
 17:54:45 S-band LCP recorder input patching corrected (has been patched to X-band LCP!)  17:54:45 S-band LCP recorder input patching corrected (has been patched to X-band LCP!) 
  
 +19:46:00 DC2(LCP/​LNA2/​HEMT) Tsys logging started  ​
 +
 +19:58:00 70m observation finished
 +
 +Note added on 2012 June 4: Tsys files have been uploaded to atnf ftp infoming area. 
  
  
lbaops/lbaapr2012/v466atilog.1335724472.txt.gz · Last modified: 2015/12/18 16:38 (external edit)