User Tools

Site Tools


lbaops:lbaapr2013:re03qsatlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbaapr2013:re03qsatlog [2013/04/09 04:18]
hbignall
lbaops:lbaapr2013:re03qsatlog [2015/12/18 16:38] (current)
Line 1: Line 1:
-No (or very weak to Ho) fringes at C-band in vc200b.+No (or very weak to Ho) fringes at C-band in vc200b. ​NB this turned out to be due to combination of DAS profile and recording ("​inverted recording"​ option) not resulting in the expected inversion/​channel ordering. (Eventually solved by Chris, so data should all be recoverable.)
  
 Fringes to Cd in vc200a. Fringes to Cd in vc200a.
  
 Pcals done:\\ Pcals done:\\
-L-band: ~11:40, 12:35.+L-band: ~11:40, 12:35, 16:25, 18:05, 18:18
  
-C-band: 16:​05. ​(abph 0 -90) +C-band (abph 0 -90): 16:05, 18:29 
- +
-L-band: 16:25, 18:05, 18:18.+
  
 Cdisko gui had frozen. Recording still seems OK. After ctrl-c in window running cdisko2, could not restart because of "X11 connection rejected"​. Logged in as vlbi@cavsi1 in another window and restarted OK at ~17:55 UT. Experiment queue still seems to be running/​changing as expected. Cdisko gui had frozen. Recording still seems OK. After ctrl-c in window running cdisko2, could not restart because of "X11 connection rejected"​. Logged in as vlbi@cavsi1 in another window and restarted OK at ~17:55 UT. Experiment queue still seems to be running/​changing as expected.
  
lbaops/lbaapr2013/re03qsatlog.txt · Last modified: 2015/12/18 16:38 (external edit)