User Tools

Site Tools


lbaops:lbafeb2009:v255dholog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbafeb2009:v255dholog [2009/02/25 01:41]
breid
lbaops:lbafeb2009:v255dholog [2015/12/18 16:38] (current)
Line 16: Line 16:
  
 Change from single pol dual freq to dual pol single freq at 14:35:20 complete at 14:36:30 Change from single pol dual freq to dual pol single freq at 14:35:20 complete at 14:36:30
 +
 +173100 - Windstow. ​ Somehow we ended up at X=+88 \\
 +195000 - Observing again. \\
 +225930 - Hobart pulled the pin on the experiment to sort out an antenna safety issue with the brakes.
 +
  
  
  
  
lbaops/lbafeb2009/v255dholog.1235486500.txt.gz · Last modified: 2015/12/18 16:38 (external edit)