User Tools

Site Tools


lbaops:lbajul2010:v309b

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbajul2010:v309b [2010/07/23 19:40]
chris.phillips
lbaops:lbajul2010:v309b [2015/12/18 16:38] (current)
Line 30: Line 30:
 Please note vc120 schedule will not be used. At 17:00 UT, start with vf309b schedule and we will swap to v309b when fringes are found and clocks sorted. Please note vc120 schedule will not be used. At 17:00 UT, start with vf309b schedule and we will swap to v309b when fringes are found and clocks sorted.
  
-This is a 2 DAS experiment. Each DAS needs to be run as a seperate ​DiFX correlation+This is a 2 DAS experiment. Each DAS needs to be run as a separate ​DiFX correlation
  
 =====  DAS1 ===== =====  DAS1 =====
Line 42: Line 42:
  
 | ATCA    | cave03-ext | 0 KB | | ATCA    | cave03-ext | 0 KB |
-| Parkes ​ | cave05-ext | ?? KB |+| Parkes ​ | cave05-ext | 2000 KB |
  
 Processing cave09,​cave10,​cave11 Processing cave09,​cave10,​cave11
lbaops/lbajul2010/v309b.txt · Last modified: 2015/12/18 16:38 (external edit)