 +Correlation done on CAVE.
 +
 +vc016a schedule run as run-fringe.sh for setting up.
 +
 +vx016a schedule ran all night. Minor differences with telescope schedules, meant that most 3c273 and 1520-58 scans not correlated. Slews were long and Pks never made it to source. Should not be scheduled in this way.
 +
 +11:33UT. Restarted correlator. All ok.
 +
  