-Schedule for all vc050 tests are\+Schedule for all vc050 tests is vc050. It is a relative schedule. The following steps should be done (change to next step should coordinated with other telescopes). Note in wiki what is recorded when! 
 + 
 +  *  **CACAL**: Track 1 and cacal, then track 2 and cacal. Start next step when other telescopes ​are ready 
 + 
 +  *  **DAS1/DAS2 calibration**:​ Track 1 and record channels 1-8. 
 + 
 +  *  **IFP2/IFP2 calibration**:​ Track 1 and record channels 1-4. 
 + 
 +  *  **Split mode fringe check**: Track 2 and record channels 2,3,7,8. 
 + 
 +At end track 3 - it is the first source of the main schedule. 
 + 
 +Recorded: 
 + 
 +  /​data/​xraid3 ​ 08:​30-08:​38 ​  ATNF V013B 
 +  /​data/​internl 08:​38-08:​50 
  
  