User Tools

Site Tools


lbaops:lbamar2017:v252bhkelog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbamar2017:v252bhkelog [2017/03/19 20:16]
breid
lbaops:lbamar2017:v252bhkelog [2017/03/20 05:49]
breid
Line 3: Line 3:
   * Drift started 01:31 UT - drift rate was fairly constant.   * Drift started 01:31 UT - drift rate was fairly constant.
   * Power cycle of DBBC finished at 05:59 UT Time delays stable again (Bryn)   * Power cycle of DBBC finished at 05:59 UT Time delays stable again (Bryn)
-  * Module will run out of space at approximately 15:00UT - Experiment will be on Modules BKG+0120 (Up to ~15:00UT) and USN-0014 (After ~15:00UT)+  * Module will run out of space at approximately 15:00UT - Experiment will be on Modules BKG+0120 (Up to ~15:21 UT) and USN-0014 (After ~15:21 UT) 
 +  * Drive status not ready, error getting return from antenna between 17:20 UT and 17:42 UT when antenna communications were restored.  
 +  * Lost control due to ke internet(?) around 18:00UT, regained control at approx 18:44 UT. 
  
lbaops/lbamar2017/v252bhkelog.txt · Last modified: 2017/03/20 05:49 by breid