User Tools

Site Tools


lbaops:lbamay2018:gs042atlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

lbaops:lbamay2018:gs042atlog [2018/05/14 20:29] (current)
pge created
Line 1: Line 1:
 +
 +ATCA on source at start of schedule, 9:45 UT.
 +
 +Using antennas CA01, CA02, CA04 and CA05.
 +(mm receiver on CA03 being warmed for maintenance,​ baseline to CA06 too long.)
 +
 +Array is in a 6km array configuration:​ not optimal for phase stability.
 +
 +10:15UT do a manual phase cal: tied array amplitude immediately increases from ~11Jy to 15Jy,
 +and stays at the higher level for the next 15 minutes (and counting...)
  
lbaops/lbamay2018/gs042atlog.txt · Last modified: 2018/05/14 20:29 by pge