User Tools

Site Tools


lbaops:lbanov2008:v271bcdlog

After redrudging the schedule, the systemp command was not re-included into the proc file. No systemp measurements until the problem was detected at 0515

DAS profile VSOP.PRO

Agilent - 13.04 GHz

2nd LOs set to 428, 684 MHz

Recorded data to disks V001B

lbaops/lbanov2008/v271bcdlog.txt · Last modified: 2015/12/18 16:38 (external edit)