User Tools

Site Tools


lbaops:lbanov2013:v389dtilog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbanov2013:v389dtilog [2013/11/22 22:08]
shoriuchi
lbaops:lbanov2013:v389dtilog [2015/12/18 16:38] (current)
Line 1: Line 1:
 DAS vsop_f pro DAS vsop_f pro
  
-IF1: LNA2 -> DC -> H/L +IF1: LCP -> LNA2 -> DC -> H/L -> Block-0 IF1
  
-IF2: LNA2 -> D/C -> ch8 optical fiber at Block-0+IF2: LCP -> LNA2 -> D/C -> ch8 optical fiber ->  Block-0 IF 2 
 + 
 +ATT at Block-0 ​0 dBm for both IFs
  
 2nd LO 485 MHz  2nd LO 485 MHz 
Line 12: Line 14:
  
 11:05:00 fringe confirmed 11:05:00 fringe confirmed
 +
 +15:01:00 Stop 
 +
lbaops/lbanov2013/v389dtilog.txt · Last modified: 2015/12/18 16:38 (external edit)