User Tools

Site Tools


lbaops:lbaoct2010:v252tpalog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbaoct2010:v252tpalog [2010/10/29 09:11]
tasso
lbaops:lbaoct2010:v252tpalog [2015/12/18 16:38] (current)
Line 4: Line 4:
  
 Stopped at 22:09UT. Installing 22 GHZ receiver. Planned interruption in schedule. Stopped at 22:09UT. Installing 22 GHZ receiver. Planned interruption in schedule.
 +
 +Back onsource at 04:07:40UT. Wrap issues and next scan missed while slewing (#87)...
  
  
lbaops/lbaoct2010/v252tpalog.txt · Last modified: 2015/12/18 16:38 (external edit)