User Tools

Site Tools


lbaops:lbaoct2018:rg39datlog

ATCA on schedule at 22:48 UT, however the fringe is rather weak. Phase stability is bad and the array is in a rather extended 750A configuration. Dropped antennas from tied array at 22:59 (only have single 4-5 baseline left, which is about 77m)

lbaops/lbaoct2018/rg39datlog.txt · Last modified: 2018/10/29 10:05 by maxvoronkov