User Tools

Site Tools


lbaops:lbascheduling

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbascheduling [2018/07/20 16:59]
cormac
lbaops:lbascheduling [2019/02/28 15:30] (current)
cormac
Line 21: Line 21:
 ATCA \\ ATCA \\
 CEDUNA ​  (LBA DAS) \\ CEDUNA ​  (LBA DAS) \\
-CDDBBC (Ceduna with Mark5 recorder) \\ +CDDBBC (Ceduna with DBBC) \\ 
-HART     (26m Hartebeesthoek, ​Mark5) \\ +HART     (26m Hartebeesthoek, ​DBBC) \\ 
-HART15M ​ (15m Hartebeesthoek, ​Mark5) \\+HART15M ​ (15m Hartebeesthoek, ​DBBC) \\
 HOBART ​  ​(Hobart 26m with LBA DAS) \\ HOBART ​  ​(Hobart 26m with LBA DAS) \\
 HOB_MK5 ​ (Hobart 26m with MarkIV rack and Mark5 recorder) ​ \\ HOB_MK5 ​ (Hobart 26m with MarkIV rack and Mark5 recorder) ​ \\
-HOB_DBBC ​ (Hobart 26m with DBBC and Mark5 recorder)  \\+HOB_DBBC ​ (Hobart 26m with DBBC)  \\
 KATHERIN ​ \\ KATHERIN ​ \\
 MOPRA \\ MOPRA \\
 PARKES ​  (LBA DAS) \\ PARKES ​  (LBA DAS) \\
-PARK_MK5 (Parkes with Mark5 recorder) \\ +PARK_MK5 (Parkes with MarkIV rack and Mark5 recorder) \\ 
-WARK12M ​ (12m Warkworth, ​Mark5 recorder) \\ +WARK12M ​ (12m Warkworth, ​DBBC) \\ 
-WARK30M ​ (30m Warkworth, ​Mark5 recorder) \\+WARK30M ​ (30m Warkworth, ​DBBC) \\
 YARRAGAD \\ YARRAGAD \\
 DSS43LBA (Tid 70m with LBA DAS) \\ DSS43LBA (Tid 70m with LBA DAS) \\
-DSS43    (Tid 70m with Mark5 recorder) \\+DSS43    (Tid 70m with DVP) \\
 DSS34LBA (Tid 34m with LBA DAS) \\ DSS34LBA (Tid 34m with LBA DAS) \\
 DSS34    (Tid 34m with DVP) \\ DSS34    (Tid 34m with DVP) \\
Line 145: Line 145:
  
 http://​www.vlba.nrao.edu/​astro/​calib/​ http://​www.vlba.nrao.edu/​astro/​calib/​
 +
 +==== Number of Scans ====
 +The control systems at ATCA and Mopra limit the number of scans in a single schedule to 699. If your schedule requires more than 699 scans for any reason, please consult with LBA staff before finalising. ​
 +
 +Field System controlled stations (e.g. UTAS and Warkworth telescopes) have a limit of 20000 scans at the time of writing (2019 January), which is unlikely to be a significant constraint.
  
 ==== Scan Gaps ==== ==== Scan Gaps ====
lbaops/lbascheduling.1532069960.txt.gz · Last modified: 2018/07/20 16:59 by cormac