User Tools

Site Tools


lbaops:lbasep2009:v255fholog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

lbaops:lbasep2009:v255fholog [2009/09/04 20:47]
breid
lbaops:lbasep2009:v255fholog [2015/12/18 16:38]
Line 1: Line 1:
-From about 4:40/247 UT/DOY until  4:56/247 we lost the external reference phase lock on the 2nd LO. 
-The oscillator was accidentally turned off and the LO signal was also lost for a minute or two, before the unit was turned back on. 
-Observer, Warren. 
-The DAS aborted at UT 10:​08. ​ I restarted with vsop.pro. ​ Shortly after I checked coherence and did not find it.  I reprogrammed the das using profile vsop_ho.pro. ​ This time I got coherence. ​ Finished at 10:30 UT.  jd 
- 
  
lbaops/lbasep2009/v255fholog.txt · Last modified: 2015/12/18 16:38 (external edit)