lbaops:telecon2010mar02 [2010/03/18 12:25]
tasso
lbaops:telecon2010mar02 [2015/12/18 16:39] (current)
Line 46: Line 46:
 Only items relevant to the next VLBI session are included here. Only items relevant to the next VLBI session are included here.
  
-%red* ALL DONE in time (18/3/2010) ** 
  
   *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)   *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)
Line 65: Line 64:
  
   *  Get copy of Rb-clock test data to Cormac. (Chris).   *  Get copy of Rb-clock test data to Cormac. (Chris).
 +
 +** ALL DONE in time (18/3/2010) **
  
  
 Next meeting: Post-session debrief, week 15-19 March? Next meeting: Post-session debrief, week 15-19 March?
  