User Tools

Site Tools


lbaops:telecon2013aug27

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:telecon2013aug27 [2013/08/28 01:05]
tasso
lbaops:telecon2013aug27 [2015/12/18 16:39] (current)
Line 16: Line 16:
 Chair: Tasso Tzioumis Chair: Tasso Tzioumis
  
-Attendance: ​+Attendance: ​Cormac Reynolds (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Yiannis Gonidakis (CASS Marsfield); Jamie Stevens (CASS Narrabri); Shinji Horiuchi (ATDSCC); Jamie McCallum, Brett Reid (UTas); ​ Laura(GA); ​ Stuart Weston (AUT, NZ)
  
 Apologies: ​ Apologies: ​
Line 126: Line 126:
 NEW ACTION ITEMS NEW ACTION ITEMS
  
 +  *  Investigate remote resets on PMON at ATCA? Now need DA (Phil, Jamie)
 +  *  DA role during LBA sessions (Phil, Tasso, Jamie S)
 +
 +  *  Check Mp at 22 and 32 GHz for coherence and fringes (Chris, Jamie S, Tasso, Phil)
 +
 +  *  Procedures for raising Ho observers on Skype. Telephone? (UTas)
 +
 +  *  Get Ww FS log comments onto Wiki. Use UTas "​floggit"​ script and automate? (Stuart, Chris, Jamie M.)
 +
 +  *  Need VSIC remote switch for Tid to avoid cable problems. Check at ATNF (Chris, Jamie S., Tasso)
 +
 +  *  Trial Ke and Yg remote monitoring. Check network loading (Jamie & Jamie)
 +
 +  *  Spare 500 GB disks from ATNF to UTas for Xraid rebuilds (Chris, Jamie M.)
 +
 +  *  Keep vc numbering for rtfc but use separate schedules only when necessary (Phil, Cormac)
 +
 +  *  Fix recmon to track correct experiment name, especially due complex recordings for Ellingsen (Chris, Jamie S)
 +
 +  *  List Mk5 rtfc times for each observation from schedules (Cormac, Chris)
 +
 +  *  Prepare for next LBA session on 18-26 November 2013 (All)
 +  *  Arrange support for spacecraft observations on 29 Dec. (ATNF)
 +  *  Prepare for Feb-March 2014 runs around VSOP sessions. 2-3 days every 9 days. 4 runs (21/2, 2/3, 10/3, 17/3)  - ALL
 +
 +  *  Prepare for special arrangements to cope with possible PB store relocation and ~6-week break (Cormac, All)
  
 STANDING ACTION ITEMS STANDING ACTION ITEMS
Line 131: Line 157:
   *  Next LBA Ops meeting in Feb 2014. Perth? Decide dates and place (Tasso)   *  Next LBA Ops meeting in Feb 2014. Perth? Decide dates and place (Tasso)
  
-  *  VLBI science meeting in 2014 at Darwin (?) and setup LOC, SOC (Tasso)+  *  VLBI science meeting in 2014 at Darwin (?) and setup LOC, SOC (Tasso, Jim)
  
  
lbaops/telecon2013aug27.txt · Last modified: 2015/12/18 16:39 (external edit)