# 2012APRS LBA Block Schedule for the September 2012 session Version 1.3 Time-stamp: <2012-09-13 12:00:00> # # Session times: 258/1400 - 262/2200 UT # # 1.0 27-aug-2012 pge : first draft # 1.1 30-aug-2012 pge : change v252 to 2xX and 1xK # 1.2 12-sep-2012 pge : finalise v469a mode and overall telescope participation # 1.3 13-sep-2012 pge : correct vc... numbering # # ############################################ # # Code Band setup Antennas start UT stop UT Comment/PI # setup/bandw(MHz) # ---- ---------------- ------------------- --------- --------- -------- # # vt02q S/X-1p-8IF/16 AtCdHoMpPa 258 1400 258 1900 Phillips # v469a S/X-1p-8IF/16 At-Cd-Ho-Mp-Pa-Ti-Hh-Ak-Yg 258 1900 259 1900 Shabala # vc179 8.4GHz-1p-4IF/16 At-Cd-Hh-Ho-Pa 259 1900 259 2000 check v252ae 8.4GHz-1p-4IF/16 At-Cd-Hh-Ho-Pa-Ti-Tc-Ak 259 2000 260 2000 Ojha # vc180 8.4GHz-1p-4IF/16 At-Cd-Hh-Ho-Pa 260 2000 260 2100 check v252af 8.4GHz-1p-4IF/16 At-Cd-Hh-Ho-Pa-Ti-Tc-Ak 260 2100 261 2100 Ojha # vc181 22GHz-1p-4IF/16 At-Cd-Ho-Mp-Pa-Hh 261 2100 261 2200 check v252ag 22GHz-2p-2IF/16 At-Cd-Ho-Mp-Pa-Hh 261 2200 262 2200 Ojha #