VLBI teleconference, 29 October 2008
12.00 Perth, 14.00 Eastern, 16.00 New Zealand
Phone:
| Vic: | 03 9545 8222 |
| NSW: | 02 9490 8022 |
| ACT: | 02 6276 6622 |
| Qld: | 07 3214 2311 |
| WA: | 08 6436 8844 |
| SA: | 08 8273 8122 |
| NT: | 08 8944 8488 |
| Tas: | 03 6232 5188 |
Meeting ID: 3968
Chair'
Agenda
- Preparation for November VLBI session (Phillips/Tzioumis)
- Who is going where?
- Disk requirements?
- eVLBI tests to Curtin (Phillips/Tingay)
- ASKAP VLBI Expression of Interest (Tingay)
- Update on Curtin correlator (Bignall)
- Status of Ceduna relative delay changes between polarizations (Simon)
- Block schedules in 2009 (UTAS is likely to be a bit stretched personnel wise in 2009 and Simon would like to discuss options to ease some of the pressure with more Ceduna friendly block schedules)
- Update on Hobart DiFX installation and AuScope project (Lovell)
- Update on New Zealand antenna (Gulyaev)
- Update on Curtin cluster at Narrabri (Phillips/Amy)
- IYA 24hr eVLBI demo (Phillips)
Actions arising
- Tasso and Steven to determine if a Curtin person can go to observe at Parkes for the November session. ATNF can support travel. (Tasso/Steven)
- Hayley, Claire, Chris and Indra to iterate in more detail on the disk requirements and numbers available for the November session. Initial estimates look ok, but a deeper check needed. (Hayley/Claire/Chris/Indra)
- Correct version of DiFX needs to be installed at Curtin for support of Mark5 format eVLBI tests. (Cormac/Chris)
- Check with Mark Favas on upgrade of Curtin connection via iVEC at enable 6 x 256 Mbps eVLBI to Curtin. (Steven)
- Start production of ASKAP VLBI/eVLBI EoI when EoI announcement made on Nov 1. (Steven coordinate + all)
- More investigation of the polarisation-dependent delays at Ceduna and perhaps scheduling of a test observation in November to debug. (Jim/Richard)
- Investigate options for buying out Swinburne VLBI pool disks that are excess to what Matthew wants to keep for ongoing research. (Tasso/Steven)
- One of Curtin Mark5B+ units to be shipped to AUT when they arrive, plus an invoice to AUT. (Steven)
- Work to get the Curtin cluster at Narrabri up and running ASAP, maybe with an interim switch. (Tasso/Chris/Shaun)
- Move of Swinburne archive of correlated VLBI data over to ATNF, with a copy to stay at Curtin for redundancy. (Steven/Claire)
- Organise next telecon: 19 November 2008, 2pm Sydney time (Tasso/Chris)
|