This loads a font easier to read for people with dyslexia.
This renders the document in high contrast mode.
This renders the document as white on black
This can help those with trouble processing rapid screen movements.

RE: Disk space required for Cir X-1 ToO VLBI

From: <aquib.moin_at_email.protected>
Date: Wed, 3 Nov 2010 02:40:29 +0000

Hi Chris,

Ok, will do.

James and I can certainly pull the eVLBI data to have a quick look at what the source is doing.

For the CABB observations starting from 8AM, will we have the full ATCA array available?

Thanks and best regards,

Aquib
________________________________________
From: Chris Phillips [Chris.Phillips_at_csiro.<!--nospam-->au]
Sent: Wednesday, 3 November 2010 10:19 AM
To: Aquib Moin
Cc: vlbiobs_at_atnf.<!--nospam-->csiro.au; James.Miller-Jones_at_curtin.<!--nospam-->edu.au; c.reynolds_at_curtin.<!--nospam-->edu.au; steven.tingay_at_icrar.<!--nospam-->org; george_at_hartrao.<!--nospam-->ac.za
Subject: Re: Disk space required for Cir X-1 ToO VLBI

Hi Aquib

If you are updating the schedule please start it from 8AM ADST (21:00UT). We may do some ATCA-Mopra before the official start time

The current plan is to do some CABB observations at around 8am ADST then try some ATCA-Mopra eVLBI for a few hours.

I am assuming there will be some one from the proposers (James/Aquib?) who will be ready to run some data through AIPS immediately if we have some, sometime during the day. We will probably run ATCA-Parkes and Mopra as simultaneous eVLBI/disk recording.

Cheers
Chris

------------------------------------------------------------
Chris Phillips
CSIRO ATNF eVLBI project scientist
Office: (+61) (0)2 93724608 Mobile: (+61) (0)439487601

On 03/11/2010, at 1:15 PM, Aquib Moin wrote:

>Hi Chris, Jon
>
>Thats great, I have already updated the vx016c schedule to 256 Mbps and will similarly finalize vx016d and vx016e schedules. The last thing, I believe we need to do is to include Tid in the schedule as it might become available for the experiment as well.
>
>Im going to insert Tid in the schedule, which is version 3 at the moment, and will make a version 4, which will be the one to use.
>
>Thanks and best regards,
>
>Aquib
>________________________________________
>From: Chris Phillips [Chris.Phillips_at_csiro.<!--nospam-->au]
>Sent: Wednesday, 3 November 2010 6:04 AM
>To: Aquib Moin
>Cc: vlbiobs_at_atnf.<!--nospam-->csiro.au; James.Miller-Jones_at_curtin.<!--nospam-->edu.au; c.reynolds_at_curtin.<!--nospam-->edu.au; steven.tingay_at_icrar.<!--nospam-->org; g
>Subject: Re: Disk space required for Cir X-1 ToO VLBI
>
>Hi Aquib
>
>At 256 Mbps:
>
>Parkes is fine (capacity still available)
>Mopra and ATCA are fine (may need a disk change today)
>Ceduna is fine (unless the currently. available space is needed for something else)
>Hobart will require a disk change, though have enough online for tomorrows experiment.
>
>Cheers
>Chris
>
>------------------------------------------------------------
>Chris Phillips
>CSIRO ATNF eVLBI project scientist
>Office: (+61) (0)2 93724608 Mobile: (+61) (0)439487601
>
>
>
>On 03/11/2010, at 4:29 AM, Aquib Moin wrote:
>
>>Hi all,
>>
>>The following table indicates the SCHED estimates of disk space that the included stations would require for all three Cir X-1 ToO VLBI sessions (4,6,8 November) if we go for 256 Mbps.
>>
>>Please advise if the concerned stations have adequate disk capacity left to meet these requirements, otherwise we could choose to go for 128 Mbps
>>
>>Nov 4 Nov 5 Nov 8
>>vx016c vx016d vx016e Total (at each station)
>>(GB) (GB) (GB) (GB)
>>
>>AT 697 782 461 1940
>>MP 697 782 461 1940
>>PA 697 697
>>HO 697 782 461 1940
>>CD 697 782 461 1940
>>HH 300 383 683
>>
>>
>>
>>Thanks and best regards,
>>
>>Aquib
>
Received on 2010-11-03 13:40:55