User Tools

Site Tools


lbaops:agendalba-ops-2015

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:agendalba-ops-2015 [2015/02/11 02:34]
shoriuchi
lbaops:agendalba-ops-2015 [2015/12/18 16:38] (current)
Line 1: Line 1:
-**DRAFT** +===== LBA Ops and technical meeting, 17-18 Feb 2015, the Meeting Room in the Training Building, CDSCC, Tidbinbilla, ACT =====
- +
- +
-//LBA Ops and technical meeting, 17-18 Feb 2015, Meeting Room, CDSCC, Tidbinbilla, ACT+
 ----------------------------------------------------------------------------- -----------------------------------------------------------------------------
  
Line 12: Line 9:
  
  
-|  8:30-8:35    | Introduction | Ed & SHinji |+|  8:30-8:35    | Introduction | Ed & Shinji |
 |  8:35-8:45    | Access to Tid and need for fast network | Ed | |  8:35-8:45    | Access to Tid and need for fast network | Ed |
 |  8:45-9:15    | LBA Proposals and block scheduling | Phil | |  8:45-9:15    | LBA Proposals and block scheduling | Phil |
Line 44: Line 41:
     *  Tid (Shinji)      *  Tid (Shinji) 
     *  UTAS including AuScope (JamieMc, Jim)     *  UTAS including AuScope (JamieMc, Jim)
-    *  AUT including 30m developments+    *  AUT including 30m developments (StuartW) [[lbaops:({{)warkworth2015:pdf]]}}
  
   *  Observing issues (Chris) 30min    *  Observing issues (Chris) 30min 
Line 83: Line 80:
  
  
-**18:30 - 22:00 Dinner **+**17:00 - 22:00 Dinner **
  
 -------------------------- --------------------------
Line 93: Line 90:
  
 |  8:30-9:00    | AARNet Report | Tim Rayner | |  8:30-9:00    | AARNet Report | Tim Rayner |
-|  9:00-9:30    | NRN 10 Gbps upgrade | Alfred|+|  9:00-9:30    | NRN 10 Gbps upgrade | Alfred |
 |  9:30-10:00    | Tid Network Upgrade | John remotely | |  9:30-10:00    | Tid Network Upgrade | John remotely |
 |  10:00-10:30    | LBA Technical developments | Chris | |  10:00-10:30    | LBA Technical developments | Chris |
 | 10:30-11:00 | Morning Tea | | | 10:30-11:00 | Morning Tea | |
-| 11:00-11:30 | IM&T Resources | Afred? |+| 11:00-11:30 | IM&T Resources | John Morrissey |
 | 11:30-12:00 | Future eVLBI | Chris | | 11:30-12:00 | Future eVLBI | Chris |
 | 12:00-12:30 | Review of actions and general discussion || | 12:00-12:30 | Review of actions and general discussion ||
Line 105: Line 102:
  
   *  AARNet report (30 mins) (Tim Rayner)   *  AARNet report (30 mins) (Tim Rayner)
-  *  NRN 10 Gbps upgrade (30min) (Alfred?+  *  NRN 10 Gbps upgrade (30min) (Alfred) 
   *  Tid network upgrade (30min)   *  Tid network upgrade (30min)
   * Technical developments (Chris Phillips) (30min)   * Technical developments (Chris Phillips) (30min)
Line 114: Line 111:
   *  Morning Tea   *  Morning Tea
   *  Available IM&T resources (30min)   *  Available IM&T resources (30min)
-    *  Review of available resources by Alfred?+    *  Review of available resources (John Morrissey)
   *  Future eVLBI (30min)   *  Future eVLBI (30min)
     *  Direction     *  Direction
lbaops/agendalba-ops-2015.1423582469.txt.gz · Last modified: 2015/12/18 16:38 (external edit)