This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
lbaops:lbaaug2008:v255batlog [2008/08/08 01:14] hbignall |
lbaops:lbaaug2008:v255batlog [2015/12/18 16:38] (current) |
||
---|---|---|---|
Line 6: | Line 6: | ||
The rest of the time, CA01,3,4,5 were tied. | The rest of the time, CA01,3,4,5 were tied. | ||
- | |||
- | CACALs for phase done at UT 1158, 1256, 1512. | ||
UT 1436: Mode change and RAID slice change. | UT 1436: Mode change and RAID slice change. | ||
+ | |||
+ | UT 1535: 10 minutes late with mode change back to dual pol/single IF recording | ||
+ | |||
+ | Apart from initial cal, CACALs for phase done at UT 1158, 1256, 1512. | ||
+ | Phase spread was big after UT 1436 mode change until CACAL done at 1512. | ||
+ | |||