Line 1: Line 1:
-Recording with Disco (not cDisko!) to ATNF_V011/​B1-B7 mounted as /​data/​xraid1 ​+Recording with Disco (not cDisko!) ​on tidvsi ​to ATNF_V011/​B1-B7 mounted as /​data/​xraid1 ​
  
 DAS Profile vsop_f.pro, 2nd LO 485 MHz  DAS Profile vsop_f.pro, 2nd LO 485 MHz 
  
-256.03:10:00 70m started schedule, on point and recording (1257-326) ​+226.03:10:00 70m started schedule, on point and recording (1257-326) ​
  
-256.03:​19:​40-03:​27:​55 long slweing ​for next source+226.03:​19:​40-03:​27:​55 long slweing ​to 0516-621 at Az 214 from Az 96
  
 +226.03:​29:​00 fringe confirmed
  
 +226.03:​29:​40-03:​36:​22 long slew to 1322-428 at Az 116
  
 +..
 +
 +226.08:​20:​00-08:​29:​40 this scan (1954-388 ) is to be skipped as it requires too long slewing  ​
 +
 +226.09:​20:​00-09:​29:​40 this scan (1954-388 ) is to be skipped as it requires too long slewing  ​
 +
 +...
 +
 +The 70m observation is to be terminated at 09:59:40.
 +
 +
 +Note added on 1 Oct. 2011: tsys files, flag table, weather info file, and PC-field system log have been uploaded to ftp area. 
  
  