User Tools

Site Tools


lbaops:lbaaug2013:v255t

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbaaug2013:v255t [2013/08/14 05:15]
breid
lbaops:lbaaug2013:v255t [2013/08/14 05:41]
breid
Line 82: Line 82:
  
 The level into IF#1 will change significantly between the two setups. Set the level into the DAS so that it is within range for both setups. Setup the system temperature measurement so that it works for both IFs for the v255s.5cm setup. Please don't change the attenuation into the DAS when the setup changes as that may change the delay. The level into IF#1 will change significantly between the two setups. Set the level into the DAS so that it is within range for both setups. Setup the system temperature measurement so that it works for both IFs for the v255s.5cm setup. Please don't change the attenuation into the DAS when the setup changes as that may change the delay.
- 
-Parkes, ATCA, Mopra : 
  
 ==== Mopra : ==== ==== Mopra : ====
Line 120: Line 118:
  
 Target observations begin at 227/04:04. Target observations begin at 227/04:04.
 +
 +Hart only participates in 2nd and 4th ICRF bloc observations.
  
 Not observing during these times: Not observing during these times:
  
 226 / 18:00 - 227 / 01:15\\ 226 / 18:00 - 227 / 01:15\\
-227 / 05:00 - 06:15\\ +227 / 05:00 - 06:15 \\ 
-227 / 06:51 - 07:56\\ +227 / 06:51 - 07:56 \\ 
-227 / 09:42 - 10:05\\ +227 / 09:42 - 10:05 \\ 
-227 / 11:26 - 11:44\\ +227 / 11:26 - 11:44 \\ 
-227 / 13:30 - 14:21\\ +227 / 13:30 - 14:21 \\ 
-227 / 17:15 - 18:00 (End of v255t)+227 / 17:15 - 18:00 
  
  
lbaops/lbaaug2013/v255t.txt · Last modified: 2015/12/18 16:38 (external edit)