User Tools

Site Tools


lbaops:lbaaug2013:vt10qatlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbaaug2013:vt10qatlog [2013/08/16 05:04]
ste616
lbaops:lbaaug2013:vt10qatlog [2015/12/18 16:38] (current)
Line 5: Line 5:
 Both antennas on same Narrabri maser, started at 18:24. Both antennas on same Narrabri maser, started at 18:24.
  
-Both antennas were disconnected 18:57, and were rephased on the Mopra maser by 17:03.+Both antennas were disconnected 18:57, and were rephased on the Mopra maser by 17:​03. ​This continued until the end of the recording at around 18:06 or so. 
 + 
 +Then we discovered a problem with the way the test gear was configured, so we repeated the experiment. The antennas were put back in the same way, with the Narrabri maser, until 20:35, then the Mopra maser was reconnected and the array rephased at 20:44. Yabei reports the maser recording equipment was ready at 2052:10. 
lbaops/lbaaug2013/vt10qatlog.txt · Last modified: 2015/12/18 16:38 (external edit)