User Tools

Site Tools


lbaops:lbadec2009:v255hcdlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbadec2009:v255hcdlog [2009/12/11 11:34]
cehotan
lbaops:lbadec2009:v255hcdlog [2015/12/18 16:38] (current)
Line 1: Line 1:
-Recording to V012B.+Basic information.
  
-First LO set to 11.1 GHz.+  Recording to ATNF V012B.
  
-345:23:00 On schedule.+  First LO set to 11.1 GHz.
  
-IF ch1 LO 810 MHz+344:23:00:
  
-IF ch2 LO 810 MHz+  On schedule.
  
-345:23:07+  IF ch1 LO 810 MHz
  
-IF ch1 LO 468 MHz and power adjusted for DAS+  IF ch2 LO 810 MHz
  
-IF ch2 LO 810 MHz+344:23:07:
  
-345:23:59:+  IF ch1 LO 468 MHz and power adjusted for DAS
  
-IF ch1 LO 810 MHz and power adjusted for DAS+  IF ch2 LO 810 MHz 
 + 
 +344:23:59: 
 + 
 +  IF ch1 LO 810 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz 
 + 
 +345:03:15: 
 + 
 +  IF ch1 LO 468 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz 
 + 
 +345:04:00: 
 + 
 +  IF ch1 LO 810 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz 
 + 
 +345:07:20: 
 + 
 +  IF ch1 LO 468 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz
  
-IF ch2 LO 810 MHz 
  
  
lbaops/lbadec2009/v255hcdlog.1260491647.txt.gz · Last modified: 2015/12/18 16:38 (external edit)