User Tools

Site Tools


lbaops:lbadec2009:v255hcdlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbadec2009:v255hcdlog [2009/12/11 12:19]
cehotan
lbaops:lbadec2009:v255hcdlog [2015/12/18 16:38] (current)
Line 1: Line 1:
-Recording to V012B.+Basic information.
  
-First LO set to 11.1 GHz.+  Recording ​to ATNF V012B.
  
-345:23:00:+  First LO set to 11.1 GHz.
  
-On schedule.+344:23:00:
  
-IF ch1 LO 810 MHz+  On schedule.
  
-IF ch2 LO 810 MHz+  ​IF ch1 LO 810 MHz
  
-345:23:07:+  IF ch2 LO 810 MHz
  
-IF ch1 LO 468 MHz and power adjusted for DAS+344:23:07:
  
-IF ch2 LO 810 MHz+  ​IF ch1 LO 468 MHz and power adjusted for DAS
  
-345:23:59:+  IF ch2 LO 810 MHz
  
-IF ch1 LO 810 MHz and power adjusted for DAS+344:​23:​59:​ 
 + 
 +  ​IF ch1 LO 810 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz 
 + 
 +345:​03:​15:​ 
 + 
 +  IF ch1 LO 468 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz 
 + 
 +345:​04:​00:​ 
 + 
 +  IF ch1 LO 810 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz 
 + 
 +345:​07:​20:​ 
 + 
 +  IF ch1 LO 468 MHz and power adjusted for DAS 
 + 
 +  IF ch2 LO 810 MHz
  
-IF ch2 LO 810 MHz 
  
  
lbaops/lbadec2009/v255hcdlog.1260494365.txt.gz · Last modified: 2015/12/18 16:38 (external edit)