User Tools

Site Tools


lbaops:lbafeb2008:v252cmplog

Recording to ATNF V015A

On source at 09:09 UT.

03:25UT Stop and stow Mopra for UPS repairs. Expect to be offline for ~1 hour. ATCA should be back on-line at this time.

05:10UT Mopra back on air, though some concerns about the UPS still. Atenuators only (reset) about 05:15. Noise sources switched on around 05:20 (05:25?) to give SDOs, but stop at that time to check problem with L/S cryo.

05:40UT back on air at Mopra. tracking okay, GTPs and SDOs okay.

lbaops/lbafeb2008/v252cmplog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1