Recording to ATNF V015A
On source at 09:09 UT.
03:25UT Stop and stow Mopra for UPS repairs. Expect to be offline for ~1 hour. ATCA should be back on-line at this time.
05:10UT Mopra back on air, though some concerns about the UPS still. Atenuators only (reset) about 05:15. Noise sources switched on around 05:20 (05:25?) to give SDOs, but stop at that time to check problem with L/S cryo.
05:40UT back on air at Mopra. tracking okay, GTPs and SDOs okay.