User Tools

Site Tools


lbaops:lbajan2009:vt12kpalog

Acquisition started at around 05:40 UT (scheduled time 05:00-08:00 UT) because of system setup, slewing, and a rx translator issue which took about 20 min to be fixed.

lbaops/lbajan2009/vt12kpalog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1