User Tools

Site Tools


lbaops:lbajan2017:v454catlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

lbaops:lbajan2017:v454catlog [2017/01/19 09:01]
pge created
lbaops:lbajan2017:v454catlog [2017/01/19 09:01] (current)
pge
Line 9: Line 9:
 Second IF amplitude and pol purity contaminated until this remedied... Second IF amplitude and pol purity contaminated until this remedied...
  
-21:30 or thereabouts,​ block rebooted, but as it's an input block, dcal needed+21:30UT or thereabouts,​ block rebooted, but as it's an input block, dcal needed
  
-21:45 take ATCA to 1934-638 to do dcal+21:45UT take ATCA to 1934-638 to do dcal
  
-21:51 dcal complete, head back to main schedule.+21:51UT dcal complete, head back to main schedule.
  
  
lbaops/lbajan2017/v454catlog.txt · Last modified: 2017/01/19 09:01 by pge