User Tools

Site Tools


lbaops:lbajul2010:vx016acorrlog

Correlation done on CAVE.

vc016a schedule run as run-fringe.sh for setting up.

vx016a schedule ran all night. Minor differences with telescope schedules, meant that most 3c273 and 1520-58 scans not correlated. Slews were long and Pks never made it to source. Should not be scheduled in this way.

11:33UT. Restarted correlator. All ok.

lbaops/lbajul2010/vx016acorrlog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1