User Tools

Site Tools


lbaops:lbajun2014:v519batlog

Sources down early in the run. Schedule crashed. Not tracking till ~19:35UT.

Pcal done during phase-ref scan at 20:56-20:57 UT. (Phases were a long way out before that.)

lbaops/lbajun2014/v519batlog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1