Ceduna power outage issues delayed start. Tracking from 167.00:55 and fringes detected at 00:57, managed to track a couple of sources until 167.01:30. Drives not able to cope with slewing under generator power. New slow speed drive pc image being installed. Schedule resumed and tracking at 167.02:31.

Log filled with antenna control system errors, can't be helped, source looks good, appears to be tracking. Field system is not communicating with antenna control after hacking. Fixed this at 167.02:50

Missed scan at 167.02:41. we're good from 167.02:51.

Slew speed reduced to half, looks like we can reach sources in time at this rate.