User Tools

Site Tools


lbaops:lbamar2006:vt07a5

This is an old revision of the document!


vt07a5 Setup:\

Description eVLBI test experiments
Antennas Pa-At-Mp
Start 76 00:00:00
Stop 76 12:00:00
PI Phillips
Channel 1 4800 - 4816 MHz USB RCP
Channel 2 4816 - 4832 MHz USB RCP
Channel 3 4800 - 4816 MHz USB LCP
Channel 4 4816 - 4832 MHz USB LCP
Bandwidth 16 MHz
Recorder Disk
DAS Mode vsop.pro (telescope)

\ Ftp: ftp://ftp.atnf.csiro.au/pub/people/vlbi/vt07/vt07a5\ —-\ \

Comments:\

\ Hobart and Ceduna are not needed.\ \ Connect DAS direct to VSIC. Chris will run all recorder software remotely.\ \ Please connect cavsi2, pkvsi2 and mpvsi1 to the DAS or consult with Chris.\ \ Schedule is just two sources (0208-512 then 0537-441, 05:00 UT change).\ \ .com and .psn files are available on ftp directory\ \

lbaops/lbamar2006/vt07a5.1142514322.txt.gz · Last modified: 2015/12/18 16:38 (external edit)