Recording on SWIN_V021 B1-B7, /data/xraid0
Polarizations swapped
22:04:20 on point (1804-502)
22:10:00 skipped this scan for 2149-306 as it requires too long slew
22:40:00 skipped this scan for 2155-304 as above
23:16:00 on point (0047-579) after loosing 6 mins for slewing
06:00:00 schedule terminated