This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
lbaops:lbamar2017:v252bhkelog [2017/03/19 20:16] breid |
lbaops:lbamar2017:v252bhkelog [2017/03/20 05:49] breid |
||
---|---|---|---|
Line 3: | Line 3: | ||
* Drift started 01:31 UT - drift rate was fairly constant. | * Drift started 01:31 UT - drift rate was fairly constant. | ||
* Power cycle of DBBC finished at 05:59 UT Time delays stable again (Bryn) | * Power cycle of DBBC finished at 05:59 UT Time delays stable again (Bryn) | ||
- | * Module will run out of space at approximately 15:00UT - Experiment will be on Modules BKG+0120 (Up to ~15:00UT) and USN-0014 (After ~15:00UT) | + | * Module will run out of space at approximately 15:00UT - Experiment will be on Modules BKG+0120 (Up to ~15:21 UT) and USN-0014 (After ~15:21 UT) |
+ | * Drive status not ready, error getting return from antenna between 17:20 UT and 17:42 UT when antenna communications were restored. | ||
+ | * Lost control due to ke internet(?) around 18:00UT, regained control at approx 18:44 UT. | ||