User Tools

Site Tools


lbaops:lbamar2017:v252bhkelog

This is an old revision of the document!


Noticed that the clkoff time was drifting for a couple of hours - reconfigured dbbc to try and fix it at 078/05:20 UT - still drifting. Reconfigured again at 05:45 UT to no effect. Attempting power cycle (Bryn)

  • Drift started 01:31 UT - drift rate was fairly constant.
  • Power cycle of DBBC finished at 05:59 UT Time delays stable again (Bryn)
  • Module will run out of space at approximately 15:00UT - Experiment will be on Modules BKG+0120 (Up to ~15:00UT) and USN-0014 (After ~15:00UT)
lbaops/lbamar2017/v252bhkelog.1489914992.txt.gz · Last modified: 2017/03/19 20:16 by breid