No fringes to Ceduna during pre-experiment checks. However, we think that the system was working properly and the issue may have been with the mixed-modes between the LBA antennas involved in the fringe check. System was coherent, no issues with Mark 5 time, setup and injected tones appeared in the expected locations in the recorded data.