User Tools

Site Tools


lbaops:lbamarch2005:v156g1

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
lbaops:lbamarch2005:v156g1 [2005/03/13 07:10]
chris.phillips
lbaops:lbamarch2005:v156g1 [2015/12/18 16:38] (current)
Line 1: Line 1:
-===== v156g1 Setup:=====+===== v156g1 Setup: ===== 
 + 
 +^Antennas ​          | Mp-At-Cd-Ho-Pa | 
 +^Start ​             | 72 10:​00:​00 ​  | 
 +^Stop               | 72 21:​48:​00 ​  | 
 +^Channel 1          | 4800 - 4816 MHz USB RCP  | 
 +^Channel 2          | 4816 - 4832 MHz USB RCP  | 
 +^Bandwidth ​         | 16 MHz         | 
 +^Recorder ​          | S2            | 
 +^S2 Mode            | 32x4-2 ​        | 
 +^DAS Mode           | vsop.pro ​     | 
 +^Buggary Cable      | out             | 
 + 
 +^Tape Change ​       | 72 15:​59:​00 ​  | 
 +---- 
 + 
 +===== Comments: ===== 
 + 
 +**NOTE**: Setup has changed. Now Rcp only and frequency shift 
 + 
 +Please observe 0537-441 starting 1hr before the start of experiment (09:00UT). Record to disk using: 
 + > vsib_record -t v156g1-XX -t 46800s -c ooxx 
 + where XX is your antenna ID (Pa,Cd etc) 
 + 
 +I suggest you also run from the data directory diskclean.pl 
 + > cd /​my/​data/​dir 
 + > diskclean.pl -age 4h 
 + 
 +Dodson: 
 + 
 +1302-638 has recently gone through it's eclipse, and it is known that there are frequency jumps when this occurs. Therefore timing observations of 1302-638 are worthwhile. 
 + 
 +Emailed comments (repeating comments):​ 
 + 
 +Files at ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​v156/​v156g1 (NOT INCOMING!!!!) 
 + 
 +  Exp. Code:  v156g1 
 + 
 + ​Notes: ​   PSR B1259-63 observation No 7. Part 1 @ 4816MHz 
 +            Full pol. obs, i.e. both L&RCP. i.e buggery cable in 
 +            Pulsar binned at AT (unless a problem). All in CATIE. 
 +            CA CCC mode psr16_128-64. 12 hrs & 2 tape sets. 
 + 
 +   Both polarisations centred at 4816. 
 + 
 +    The experiment is ~ 12 hours so two sets of tapes are needed 
 +  Tape change is at ~16UT  
 + 
 +  ATCA has a pulsar polyco but it maybe out of date.  
 + 
 +  So Parkes will have to collect the filter bank so we can find the 
 +solution. 
 + 
 + 
 +Schedule at ATCA has been prepared, but nowhere else.  
 +Pulsar observations at ATCA require three things: 
 + 
 +The CONFIG to be a pulsar one (psr16_128-64 in this case), 
 +MODE of the pulsar TARGET_NAME to be set to PSR and the polyco  
 +timing solution to be in caccc as ~corr/​cor/​pulsar/​TARGET_NAME.polyco 
 + 
 +These are setup
  
-^Antennas ​          | Mp-At-Cd-Ho-Pa |\ 
-^Start ​             | 72 10:​00:​00 ​  |\ 
-^Stop               | 72 21:​48:​00 ​  |\ 
-^Channel 1          | 4800 - 4816 MHz USB RCP  |\ 
-^Channel 2          | 4816 - 4832 MHz USB RCP  |\ 
-^Bandwidth ​         | 16 MHz         |\ 
-^Recorder ​          | S2            |\ 
-^S2 Mode            | 32x4-2 ​        |\ 
-^DAS Mode           | vsop.pro ​     |\ 
-^Buggary Cable      | out             |\ 
-\ 
-^Tape Change ​       | 72 15:​59:​00 ​  |\ 
-----\ 
-\ 
-===== Comments:\ ===== 
-\ 
-**NOTE**: Setup has changed. Now Rcp only and frequency shift\ 
-\ 
-Dodson\ 
-\ 
-1302-638 has recently gone through it's eclipse, and it is known that there are frequency jumps when this occurs. Therefore timing observations of 1302-638 are worthwhile.\ 
-\ 
-Emailed comments (repeating comments):\ 
-\ 
-Files at ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​v156/​v156g1 (NOT INCOMING!!!!)\ 
-\ 
-  Exp. Code:  v156g1\ 
-\ 
- ​Notes: ​   PSR B1259-63 observation No 7. Part 1 @ 4816MHz\ 
-            Full pol. obs, i.e. both L&RCP. i.e buggery cable in\ 
-            Pulsar binned at AT (unless a problem). All in CATIE.\ 
-            CA CCC mode psr16_128-64. 12 hrs & 2 tape sets.\ 
-\ 
-   Both polarisations centred at 4816.\ 
-\ 
-    The experiment is ~ 12 hours so two sets of tapes are needed\ 
-  Tape change is at ~16UT \ 
-\ 
-  ATCA has a pulsar polyco but it maybe out of date. \ 
-\ 
-  So Parkes will have to collect the filter bank so we can find the\ 
-solution.\ 
-\ 
-\ 
-Schedule at ATCA has been prepared, but nowhere else. \ 
-Pulsar observations at ATCA require three things:\ 
-\ 
-The CONFIG to be a pulsar one (psr16_128-64 in this case),\ 
-MODE of the pulsar TARGET_NAME to be set to PSR and the polyco \ 
-timing solution to be in caccc as ~corr/​cor/​pulsar/​TARGET_NAME.polyco\ 
-\ 
-These are setup\ 
-\ 
  
  
lbaops/lbamarch2005/v156g1.1110658217.txt.gz · Last modified: 2015/12/18 16:38 (external edit)