User Tools

Site Tools


lbaops:lbamay2005:v172c

v172c Setup:

Antennas Pa-At-Mp-Ho-Hh
Start 134 19:00:00
Stop 135 18:58:00
Channel 1 1634 - 1650 MHz USB LCP
Channel 2 1650 - 1666 MHz USB LCP
Bandwidth 16 MHz
Recorder S2
S2 Mode 32×4-2
DAS Mode vsop.pro
Buggary Cable out
Tape Change 135 00:56:00
Tape Change 135 06:56:00
Tape Change 135 12:56:00

Ftp: ftp://ftp.atnf.csiro.au/pub/people/vlbi/v172/v172c


Comments:

PCFS schedules ftp'd and drudg'd at At, Mp, Pa.

Mopra telescope schedule edited to include vt01d3 fringe-test schedule.
N.B.: Must have LCP on IFP1 input to the DAS. Mopra must switch cables!

ATCA schedule made on Leon. A time-relative schedule for 1934-638 for calibration is called V172C_setup.

lbaops/lbamay2005/v172c.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1