User Tools

Site Tools


lbaops:lbamay2005:v172c

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
lbaops:lbamay2005:v172c [2005/05/15 02:21]
tasso
lbaops:lbamay2005:v172c [2015/12/18 16:38] (current)
Line 1: Line 1:
-===== v172c Setup:=====+===== v172c Setup: ===== 
 + 
 +^Antennas ​          | Pa-At-Mp-Ho-Hh | 
 +^Start ​             | 134 19:​00:​00 ​  | 
 +^Stop               | 135 18:​58:​00 ​  | 
 +^Channel 1          | 1634 - 1650 MHz USB LCP  | 
 +^Channel 2          | 1650 - 1666 MHz USB LCP  | 
 +^Bandwidth ​         | 16 MHz         | 
 +^Recorder ​          | S2             | 
 +^S2 Mode            | 32x4-2 ​        | 
 +^DAS Mode           | [[http://​www.atnf.csiro.au/​vlbi/​dasmodes/​16-2IF-1p-a.html|vsop.pro]] | 
 +^Buggary Cable      | out             | 
 +^Tape Change ​       | 135 00:​56:​00 ​  | 
 +^Tape Change ​       | 135 06:​56:​00 ​  | 
 +^Tape Change ​       | 135 12:​56:​00 ​  | 
 + 
 +Ftp: [[ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​v172/​v172c]] 
 +---- 
 + 
 +===== Comments: ===== 
 + 
 +PCFS schedules ftp'd and drudg'​d at At, Mp, Pa. 
 + 
 +Mopra telescope schedule edited to include vt01d3 fringe-test schedule.\\ 
 +N.B.: Must have LCP on IFP1 input to the DAS. Mopra must switch cables! 
 + 
 +ATCA schedule made on Leon. A time-relative schedule for 1934-638 for calibration is called V172C_setup.
  
-^Antennas ​          | Pa-At-Mp-Ho-Hh |\ 
-^Start ​             | 134 19:​00:​00 ​  |\ 
-^Stop               | 135 18:​58:​00 ​  |\ 
-^Channel 1          | 1634 - 1650 MHz USB LCP  |\ 
-^Channel 2          | 1650 - 1666 MHz USB LCP  |\ 
-^Bandwidth ​         | 16 MHz         |\ 
-^Recorder ​          | S2             |\ 
-^S2 Mode            | 32x4-2 ​        |\ 
-^DAS Mode           | [[http://​www.atnf.csiro.au/​vlbi/​dasmodes/​16-2IF-1p-a.html|vsop.pro]] |\ 
-^Buggary Cable      | out             |\ 
-^Tape Change ​       | 135 00:​56:​00 ​  |\ 
-^Tape Change ​       | 135 06:​56:​00 ​  |\ 
-^Tape Change ​       | 135 12:​56:​00 ​  |\ 
-\ 
-Ftp: [[ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​v172/​v172c]]\ 
-----\ 
-\ 
-===== Comments:\ ===== 
-\ 
-PCFS schedules ftp'd and drudg'​d at At, Mp, Pa.\ 
-\ 
-Mopra telescope schedule edited to include vt01d3 fringe-test schedule.\ 
-\ 
-ATCA schedule made on Leon. A time-relative schedule for 1934-638 for calibration is called V172C_setup.\ 
-\ 
  
  
lbaops/lbamay2005/v172c.1116087718.txt.gz · Last modified: 2015/12/18 16:38 (external edit)