User Tools

Site Tools


lbaops:lbamay2005:vt03a2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbamay2005:vt03a2 [2005/05/17 07:02]
stingay
lbaops:lbamay2005:vt03a2 [2005/05/17 07:15]
stingay
Line 1: Line 1:
-===== vt03a2 Setup:\\\\ =====+===== vt03a2 Setup:\ =====
  
-^Antennas ​          | At-Mp-Pa-Ho-Nz |\\\+^Antennas ​          | At-Mp-Pa-Ho-Nz |\ 
-^Start ​             | 136 22:​00:​00 ​  |\\\+^Start ​             | 136 22:​00:​00 ​  |\ 
-^Stop               | 137 01:​00:​00 ​  |\\\+^Stop               | 137 01:​00:​00 ​  |\ 
-^PI                 | Steven Tingay |\\\+^PI                 | Steven Tingay |\ 
-^Channel 1          | 1650 - 1666 MHz USB RCP  |\\\+^Channel 1          | 1650 - 1666 MHz USB RCP  |\ 
-^Channel 2          | 1650 - 1666 MHz USB LCP  |\\\+^Channel 2          | 1650 - 1666 MHz USB LCP  |\ 
-^S2                 ​| ​32x4-2 (uic feedthru on) |\+^S2                 ​| ​N/A |\ 
-^Bandwidth ​         | 16 MHz         |\\\+^Bandwidth ​         | 16 MHz         |\ 
-^Recorder ​          | Disk via S2 (BG2 cable) ​            |\ +^Recorder ​          | Disk direct from DAS             |\ 
-^DAS Mode           | [[http://​www.atnf.csiro.au/​vlbi/​dasmodes/​16-1IF-2p-a.html|at16s.pro]] |\\\+^DAS Mode           | [[http://​www.atnf.csiro.au/​vlbi/​dasmodes/​16-1IF-2p-a.html|at16s.pro]] |\ 
-\\\+
-Ftp: [[ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​vt03/​vt03a2]]\\\+Ftp: [[ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​vt03/​vt03a2]]\ 
-----\\\+----\ 
-\\\+
-===== Comments:\\\\ ===== +===== Comments:\ ===== 
-\\\+
-\\\+
-ATCA and Mopra telescope schedules in place\\\+ATCA and Mopra telescope schedules in place\ 
-\\\+
-Parkes .psn schedule at ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​vt03/​vt03a1\\\+Parkes .psn schedule at ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​vt03/​vt03a1\ 
-\\\+
-Hobart VEX schedule at ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​vt03/​vt03a1\\\+Hobart VEX schedule at ftp://​ftp.atnf.csiro.au/​pub/​people/​vlbi/​vt03/​vt03a1\ 
-\\\+
-To set this experiment up:\\\+To set this experiment up:\ 
-\\\+
-1) Connect DAS output to VSIC directly (no buggery cable), and then to recorder;\\\+1) Connect DAS output to VSIC directly (no buggery cable), and then to recorder;​\ 
-\\\\ +
-2) uic feedthru on - S2\\\ +2) Change to a new directory;​\ 
-\\+
-2) Change to a new directory;\\\+3) Start recording: vsib_record -t 3h -s 2005-05-16T22:​00:​00 -o vt03a1_<​antenna>​\ 
-\\\+\
-3) Start recording: vsib_record -t 3h -s 2005-05-16T22:​00:​00 -o vt03a1_<​antenna>​\\\+
-\\\\+
  
  
lbaops/lbamay2005/vt03a2.txt · Last modified: 2015/12/18 16:38 (external edit)